BENEFITS |
COSTS |
|
(1) Potential long term improvement of anadromous fish runs by opening up new spawning areas. (PacifiCorp modeling predicts fish recovery response will be fair.) ♣ (2) Possible long term increased fishing opportunities that could contribute some amount to the local economy. ___________________________________ (3) Potential water quality improvement in the area of less algae growth. (Algae plays a part in C-Shasta life cycle. Also, some of the algae is claimed to be toxic to mammals/humans at high levels.) ♣ ___________________________________ (4) Potential water quality improvements in water temperature and nutrients. (Although turbidity and fine sediment would potentially increase.) ♣ ___________________________________ (5) Recruitment of spawning gravels downstream of dam. ___________________________________ (6) Re-establishment of a spring Chinook run for the Karuk tribe subsistence fishery. (There is no evidence to show that fish stocks exist to re-establish this run..) __________________________________ (7) Short term creation of jobs from dam
removal process. (As there is no large engineering firm in ___________________________________ (8) Exposure of previously inundated historic Shasta Nation village sites. |
(1) Impact on Yreka water supply and damage to water transmission lines. |
|
(2) The potential raise in stream bottoms and
potential inundation of low roads such as those on either side of |
|
|
(3) The potential impact of sediment release on County and state infrastructure such as bridges.♦ (Horse Creek is very susceptible) ♣ |
|
|
(4) Likely loss of values to approx. 1600 homes and home sites surrounding the reservoirs. ♣ |
|
|
(5) The potential impact of sediment on valuable mining claims in the river and the continued ability to access and suction dredge claims. |
|
|
(6) The potential flooding of private property, such as R Ranch and Blue Heron ♣ |
|
|
(7) Loss of about $1,000,000 a year in tax
revenue to |
|
|
(8) Potential loss of water use right for the
|
|
|
(9) The raw unvegetated landscape left by draining the reservoirs ♣ |
|
|
(10) Deterioration of local roads from the movement of heavy equipment to decommission dams. (Est. cost of rebuilding road at $1 million/mile –McDermott.) ♣ |
|
|
(11) Probable loss of fish hatchery that provides about 25% of the Chinook run. PacifiCorp currently pays 80% of operational costs as a mitigation for the dams. Also, cold water to operate currently comes from hypolimnion of reservoir, which would cease to exist. Groundwater has arsenic and can’t be used. |
|
|
(12) Loss of Class IV-V summer white water rafting opportunities |
|
|
(13) Potential loss of wild and scenic values. (Listed as a Scenic River from Copco into Oregon in 1994.) |
|
|
(14) Likely Loss of significant California Designated Wild Trout fishery |
|
|
(15) Loss of important tournament level bass and fishery. Loss of perch fishery. |
|
|
(16) Loss of lake recreational opportunities such as water skiing. |
|
|
(17) Potential loss of public/current private access to the waterbody (lake/river) |
|
|
(18) Loss of the lake ecosystem and the animals dependent upon it. |
|
|
(19) Loss of resort, grocery and other business income from loss of lake. |
|
|
(20) Loss of flow control for fisheries and, to a small degree, for flood control |
|
|
(21) The potential impact of up to 20 million cubic yards of sediment on spawning grounds and emerging fish. ♣ |
|
|
(22) The potential impact of sediment release on the filling of pools and cold water refugia for salmon. ♣ |
|
|
(23) The impact of sediment and possible
fisheries closure impacting the recreational fishery and economic
contributions below |
|
|
(24) Possible negative impact to coho ♣
populations which could put additional pressure on Scott and |
|
|
(25) Potential (appears to be low) of
releasing toxic substances in the sediment to the |
|
|
(26) Potential costs to rate payers of clean up of sediment if toxic deposits are found – cost unknown. (Could increase decommissioning costs.) FERC EIS estimated sediment management costs as much as $4 billion.) ♣ |
|
|
(27) Cost to rate payers ( |
|
|
(28) Loss of a source of 65 Mega Watts of
electricity. (IG=8 MW, Copco 1= 20 MW, Copco 2 = 27 MW, Keno = 0)
Costs to ratepayers of replacing source estimated at $74-167
million. (CEC |
|
|
(29) Loss of 1.8% of PacifiCorp’s generating capacity in a period it needs to increase to meet growing customer needs. |
|
|
(30) Loss of regional renewable energy source needed to meet California Renewable Action Plan targets for climate change. (Hydroelectric Project said to avoid 473,000 tons of CO2.) |
|
|
(31) Cost to rate payers of developing new
clean alternative energy sources – ( |
|
|
♣ Scientific, peer-reviewed studies
should be done by an impartial, credible authority to quantify
impact. For instance, two University of California-Davis
professors, members of the 2004 National Research Council
committee that evaluated fish issues on the
“We do think a more complete scientific analysis on the
effects of dam removal on fish and fisheries is warranted.”(PacifiCorp
officials say it is too early to consider that change to the
river by Steve Kadel, Herald and News ♦ Fish
Hatchery Bridge (not County maintained) immediately below the dam
at Irongate. County:
Klamathon Bridge on Ager Road, Ash Creek Bridge on Klamath River
Road, Walker Bridge on Walker Connection Road, Old Horse Creek
Road suspension bridge, Klamath River Bridge on Bar Road, and the
Klamath River Bridge on Elk Creek Road. State:
I-5 Bridges near Collier Rest Area, An insert in a June 2006
billing to ♠
The alternative cost of installing fishways and other mitigations
identified by FERC have been estimated by the CEC at from $223-415
million; estimated by PacifiCorp at from $300-350 million |
|
Complied by Siskiyou County Supervisor Marcia Armstrong - March 2, 2008